Sunday, May 9, 2010

Construction Progress at Number Eight

In our last installment, Number Eight had a slab.  Now it has a second floor!

The SIPs arrive



Sue checks out the slab before the walls go up.

Rob and Rod put up a corner so tour folks can see SIPs close up.

Putting a SIP in place

Now it's really looking like a house!

From the south

Joe stood atop the topsoil mountain from previous construction to take this shot of the emerging second floor.

Here come the second floor walls.  These things go up fast!

No comments:

Post a Comment